Project Overview
The 200 MTS Chimney Tower demonstrates CORRONiL CONTROL’s expertise in industrial high-rise structures, corrosion protection, and precision fabrication.

Project Details
- Location: Industrial Zone, India
- Height: 200 meters
- Material: High-grade structural steel
- Coatings: Epoxy primer + Polyurethane topcoat
- Design Standard: IS 875, IS 456 & ASTM corrosion guidelines
- Timeline: February 2024 – August 2024
- Client: Stee Art Pvt. Ltd.
Project Scope
Full fabrication, site installation, surface preparation, coating application, and inspection. Ensured structural stability under extreme conditions and long-term corrosion protection.
Technologies & Techniques
- High-precision CNC fabrication
- Surface sandblasting and cleaning
- Electrostatic epoxy coating application
- High-temperature curing for topcoat durability
- Non-destructive testing (NDT) for quality assurance
Key Benefits
- Enhanced corrosion resistance for up to 15 years
- Long-term structural integrity and safety
- Eco-friendly and sustainable coating process
- High aesthetic quality with minimal maintenance
- Compliant with international industrial standards