Project Overview
The Power Plant Piping project highlights CORRONiL CONTROL’s expertise in industrial pipe fabrication, installation, and protective coating for energy facilities.

Project Details
- Location: Industrial Power Plant, India
- Piping Material: Carbon steel & stainless steel
- Coatings: Epoxy primer + Polyurethane topcoat
- Design Standards: ASME B31.1, IS 1239, IS 1239 Part-2
- Timeline: January 2024 – June 2024
- Client: EnergyWorks Pvt. Ltd.
Project Scope
Complete pipe fabrication, pre-treatment, corrosion-resistant coating, site installation, welding, and inspection. Ensured optimal flow, leak-free joints, and long-term durability.
Technologies & Techniques
- CNC pipe cutting & bending
- Surface sandblasting and cleaning
- Industrial epoxy and polyurethane coating
- Site welding & assembly
- Non-destructive testing (NDT) for joint integrity
Key Benefits
- Durable piping systems for long-term plant operation
- Corrosion protection against high-temperature fluids
- Compliance with international industrial standards
- Eco-friendly coating and fabrication processes
- Reduced maintenance and operational downtime